Backfilling and compaction of an excavation shall accord with specification established
by the director and adopted by resolution of the board of supervisors, both as to
material and method.
(Prior code § 7571: Ord. 1000).
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');