§ 420-6.806. Construction permits.  


Latest version.
  • (a)

    The construction, alteration, relocation or replacement of an onsite wastewater treatment system, or any primary components thereof, may be lawfully performed only under a valid construction permit issued by the health officer. "Alteration," as used in this section, means a change that causes an onsite wastewater treatment system, or primary component thereof, to function in a manner that is inconsistent with the design approved by the health officer, including but not limited to a change in design daily sewage flow and the installation of supplemental treatment units.

    (b)

    The construction, alteration, relocation or replacement of an onsite wastewater treatment system, or any primary components thereof, may be lawfully performed only if the health officer has determined that a sanitary sewer is not available for connection to the structure to be served by the system.

    (c)

    All work on an onsite wastewater treatment system under a construction permit issued under Section 420-6.808 must be inspected and approved by the health officer prior to use of the onsite wastewater treatment system.

(Ord. No. 2018-25 § III, 9-11-18)