§ 450-8.016. Stationary source safety requirements.
The stationary source shall submit a safety plan to the department within one-year of the effective date of the ordinance codified in this chapter or within three years of the date a facility becomes a stationary source, that complies with the provisions of this section and that includes the safety elements listed in subsection (a). In addition, the stationary source shall comply with the safety requirements set forth in subsections (a) through (e), (i) and (j) and shall include a description of the manner of compliance with these subsections in the safety plan. A new covered process at an existing stationary source shall comply with subsections (a) through (e), (i) and (j) prior to initial startup.
(a)
Safety Program Elements. All covered processes shall be subject to the safety program elements listed below. The safety plan shall include a description of the manner in which these safety program elements listed below shall be applied to the covered process. These safety program elements shall be implemented in conformance with the California accidental release prevention program and the safety plan shall follow Chapters 5, 7, 8 and 9 of the county health services department CalARP program guidance document.
(1)
Process Safety Information.
(A)
The stationary source shall complete a compilation of written process safety information before conducting any process hazard analysis as required by this chapter. The compilation of written process safety information is to enable the stationary source and the employees involved in operating the covered process to identify and understand the hazards posed by the covered process. This process safety information shall include information pertaining to the hazards of the regulated substances used or produced by the process, information pertaining to the technology of the process, information pertaining to the equipment in the process, and information pertaining to the hazards of the regulated substances in the process.
(i)
This information shall consist of at least the following: toxicity information; permissible exposure limits; physical data; reactivity data; corrosivity data; thermal and chemical stability data; and hazardous effects of inadvertent mixing of different materials that could foreseeably occur.
(ii)
Material safety data sheets meeting the requirements of Section 5189, Title 8 of California Code of Regulations may be used to comply with this requirement to the extent they contain the information required by this subsection.
(iii)
Information pertaining to the technology of the process shall include at least the following: a block flow diagram or simplified process flow diagram; process chemistry; maximum intended inventory; safe upper and lower limits for such items as temperatures, pressures, flows or compositions; and, an evaluation of the consequences of deviations. Where the original technical information no longer exists, such information may be developed in conjunction with the process hazard analysis in sufficient detail to support the analysis.
(iv)
Information pertaining to the equipment in the process shall include: materials of construction; piping and instrument diagrams (P&ID's); electrical classification; relief system design and design basis; ventilation system design; design codes and standards employed; material and energy balances for processes built after the compliance date of the ordinance codified in this chapter; and safety systems (e.g., interlocks, detection or suppression systems).
(B)
The stationary source shall document that equipment complies with recognized and generally accepted good engineering practices.
(C)
For existing equipment designed and constructed in accordance with codes, standards, or practices that are no longer in general use, the stationary source shall determine and document that the equipment is designed, maintained, inspected, tested, and operating in a safe manner.
(2)
Operating Procedures.
(A)
The stationary source shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements:
(i)
Steps for each operating phase: initial startup; normal operations; temporary operations; emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner; emergency operations; normal shutdown; and, startup following a turnaround, or after an emergency shutdown.
(ii)
Operating limits: consequences of deviation; and steps required to correct or avoid deviation.
(B)
Safety and Health Considerations. Properties of, and hazards presented by, the chemicals used in the process; precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment; control measures to be taken if physical contact or airborne exposure occurs; quality control for raw materials and control of hazardous chemical inventory levels; and, any special or unique hazards.
(C)
Safety systems and their functions.
(D)
Operating procedures shall be readily accessible to employees who work in or maintain a process.
(E)
The operating procedures shall be reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to stationary sources. The stationary source shall certify annually that these operating procedures are current and accurate.
(F)
The stationary source shall develop and implement safe work practices to provide for the control of hazards during operations such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a stationary source by maintenance, contractor, laboratory, or other support personnel. These safe work practices shall apply to employees and contractor employees.
(3)
Employee Participation.
(A)
The stationary source shall develop a written plan of action regarding the implementation of the employee participation required by this chapter.
(B)
The stationary source shall consult with employees and their representatives on the conduct and development of process hazards analyses and on the development of the other elements of the safety program in this chapter.
(C)
The stationary source shall provide to employees and their representatives access to process hazard analyses and to all other information required to be developed under this chapter.
(4)
Training. For each employee in such covered process:
(A)
Initial Training. Each employee presently involved in operating a covered process, and each employee before being involved in operating a newly assigned covered process, shall be trained in an overview of the process and in the operating procedures as specified in subsection (a)(2)(A). The training shall include emphasis on the specific safety and health hazards, emergency operations including shutdown, and safe work practices applicable to the employee's job tasks. In lieu of initial training for those employees already involved in operating a process, an owner or operator may certify in writing that the employee has the required knowledge, skills, and abilities to safely carry out the duties and responsibilities as specified in the operating procedures.
(B)
Refresher Training. Refresher training shall be provided at least every three years, and more often if necessary, to each employee involved in operating a covered process to assure that the employee understands and adheres to the current operating procedures of the covered process. The stationary source, in consultation with the employees involved in operating the process, shall determine the appropriate frequency of refresher training.
(C)
Training Documentation. The stationary source shall ascertain that each employee involved in operating a process has received and understood the training required by this section. The stationary source shall prepare a record which contains the identity of the employee, the date of training, and the means used to verify that the employee understood the training.
(5)
Mechanical Integrity, Including the Use of Industry Codes, Standards, and Guidelines.
(A)
Application. Subsections (a)(5)(B) through (a)(5)(F) apply to the following process equipment: pressure vessels and storage tanks; piping subsystems (including piping components such as valves); relief and vent systems and devices; emergency shutdown systems; controls (including monitoring devices and sensors, alarms, and interlocks) and pumps.
(B)
Written Procedures. The stationary source shall establish and implement written procedures to maintain the on-going integrity of process equipment.
(C)
Training for Process Maintenance Activities. The stationary source shall train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee can perform the job tasks in a safe manner.
(D)
Inspection and Testing.
(1)
Inspections and tests shall be performed on process equipment. Inspection and testing procedures shall follow recognized and generally accepted good engineering practices. The frequency of inspections and tests of process equipment shall be consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. The stationary source shall document each inspection and test that has been performed on process equipment. The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed, and the results of the inspection or test.
(E)
Equipment Deficiencies. The stationary source shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in subsection (a)(1)) before further use or in a safe and timely manner when necessary means are taken to assure safe operation.
(F)
Quality Assurance. In the construction of new plants and equipment, the stationary source shall assure that equipment as it is fabricated is suitable for the process application for which they will be used. Appropriate checks and inspections shall be performed to assure that equipment is installed properly and consistent with design specifications and the manufacturer's instructions. The stationary source shall assure that maintenance materials, spare parts and equipment are suitable for the process application for which they will be used.
(6)
Management of Change.
(A)
The stationary source shall establish and implement written procedures to manage changes (except for "replacements in kind") to process chemicals, technology, equipment, and procedures; and changes to stationary sources that affect a covered process.
(B)
The procedures shall assure that the following considerations are addressed prior to any change: the technical basis for the proposed change; impact of change on safety and health; modifications to operating procedures; necessary time period for the change; and authorization requirements for the proposed change. The procedures shall also require identification and analysis of inherently safer systems as required by subsection (i).
(C)
Employees involved in operating a process and maintenance and contract employees whose job tasks will be affected by a change in the process shall be informed of, and trained in, the change prior to startup of the process or affected part of the process.
(D)
If a change covered by this section results in a change in the process safety information required by subsection (a)(1), such information shall be updated accordingly.
(E)
If a change covered by this section results in a change in the operating procedures or practices required by subsection (a)(2), such procedures or practices shall be updated accordingly.
(7)
Pre-Startup Reviews.
(A)
The stationary source shall perform a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information.
(B)
The pre-startup safety review shall confirm that prior to the introduction of regulated substances to a covered process: construction and equipment is in accordance with design specifications; safety, operating, maintenance, and emergency procedures are in place and are adequate; for new covered processes, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified covered processes meet the requirements contained in management of change, subsection (a)(6); and training of each employee involved in operating a process has been completed.
(8)
Compliance Audits.
(A)
The stationary source shall certify that they have evaluated compliance with the provisions of this section at least every three years to verify that the procedures and practices developed under this chapter are adequate and are being followed.
(B)
The compliance audit shall be conducted by at least one person knowledgeable in the process.
(C)
A report of the findings of the audit shall be developed.
(D)
The stationary source shall promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected.
(E)
The stationary source shall retain the two most recent compliance audit reports.
(9)
Incident Investigation.
(A)
The stationary source shall investigate each incident which resulted in, or could reasonably have resulted in a catastrophic release of a regulated substance.
(B)
An incident investigation shall be initiated as promptly as possible, but not later than forty-eight hours following the incident.
(C)
An incident investigation team shall be established and consist of at least one person knowledgeable in the covered process involved, including a contract employee if the incident involved work of the contractor, and other persons with appropriate knowledge and experience to thoroughly investigate and analyze the incident.
(D)
A report shall be prepared at the conclusion of the investigation which includes at a minimum: date of incident; date investigation began; a description of the incident; the factors that contributed to the incident; and recommendations resulting from the investigation. The written summary shall indicate whether the cause of the incident and/or recommendations resulting from the investigation are specific only to the process or equipment involved in the incident, or are applicable to other processes or equipment at the stationary source. The incident investigation report shall be made available to the department upon request.
(E)
The stationary source shall establish a system to promptly address and resolve the incident report findings and recommendations. As part of this system, inherently safer systems shall be identified and analyzed as required by subsection (i). Resolutions and corrective actions shall be documented.
(F)
The report shall be reviewed with all affected personnel whose job tasks are relevant to the incident findings including contract employees where applicable.
(G)
Incident investigation reports shall be retained for five years.
(10)
Hot Work.
(A)
The stationary source shall issue a hot work permit for hot work operations conducted on or near a covered process.
(B)
The permit shall document that the fire prevention and protection requirements in Section 5189 of Title 8 of California Code Regulations have been implemented prior to beginning the hot work operations; it shall indicate the date(s) authorized for hot work; and identify the object on which hot work is to be performed. The permit shall be kept on file until completion of the hot work operations.
(11)
Contractors.
(A)
Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental services which do not influence process safety, such as janitorial work, food and drink services, laundry, delivery or other supply services.
(B)
Stationary Source Responsibilities.
(i)
The stationary source, when selecting a contractor, shall obtain and evaluate information regarding the contract owner or operator's safety performance and programs.
(ii)
The stationary source shall inform contract owner or operator of the known potential fire, explosion, or toxic release hazards related to the contractor's work and the process.
(iii)
The stationary source shall explain to the contract owner or operator the applicable provisions of the emergency response program subsection (a)(12).
(iv)
The stationary source shall develop and implement safe work practices consistent with subsection (a)(2) to control the entrance, presence, and exit of the contract owner or operator and contract employees in covered process areas.
(v)
The stationary source shall periodically evaluate the performance of the contract owner or operator in fulfilling their obligations as specified in subsection (a)(11)(C).
(C)
Contract Owner or Operator Responsibilities.
(i)
The contract owner or operator shall assure that each contract employee is trained in the work practices necessary to safely perform his/her job.
(ii)
The contract owner or operator shall assure that each contract employee is instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the process, and the applicable provisions of the emergency action plan.
(iii)
The contract owner or operator shall document that each contract employee has received and understood the training required by this section. The contract owner or operator shall prepare a record which contains the identity of the contract employee, the date of training, and the means used to verify that the employee understood the training.
(iv)
The contract owner or operator shall assure that each contract employee follows the safety rules of the stationary source including the safe work practices required by subsection (a)(2).
(v)
The contract owner or operator shall advise the stationary source of any unique hazards presented by the contract owner or operator's work, or of any hazards found by the contract owner or operator's work.
(12)
Emergency Response Program.
(A)
The stationary source shall develop and implement an emergency response program for the purpose of protecting public health and the environment. Such program shall include the following elements:
(i)
An emergency response plan, which shall be maintained at the stationary source and contain at least the following elements: procedures for informing the public and local emergency response agencies about accidental releases, emergency planning, and emergency response; documentation of proper first-aid and emergency medical treatment necessary to treat accidental human exposures; and procedures and measures for emergency response after an accidental release of a regulated substance;
(ii)
Procedures for the use of emergency response equipment and for its inspection, testing, and maintenance, including documentation of inspection, testing, and maintenance;
(iii)
Training for all employees in relevant procedures and the incident command system; and
(iv)
Procedures to review and update, as appropriate, the emergency response plan to reflect changes at the stationary source and ensure that employees are informed of changes.
(B)
A written plan that complies with other federal contingency plan regulations or is consistent with the approach in the national response team's integrated contingency plan guidance ("One Plan") and that, among other matters, includes the elements provided in subsection (a)(12)(A), shall satisfy the requirements of this section if the stationary source also complies with subsection (a)(12)(C).
(C)
The emergency response plan developed under this section shall be coordinated with the community emergency response plan developed under 42 U.S.C. Section 11003. Upon request of the local emergency planning committee or emergency response officials, the stationary source shall promptly provide to the local emergency response officials information necessary for developing and implementing the community emergency response plan.
(D)
The stationary source whose employees will not respond to accidental releases of regulated substances need not comply with subsections (a)(12)(A) through (a)(12)(C) provided that they meet the following:
(i)
For stationary sources with any regulated toxic substance held in a process above the threshold quantity, the stationary source is included in the community emergency response plan developed under Section 11003 of Title 42 of the United States Code (U.S.C.); or
(ii)
For stationary sources with only regulated flammable substances held in a process above the threshold quantity the stationary source has coordinated response actions with the local fire department; and
(iii)
Appropriate mechanisms are in place to notify emergency responders when there is a need for a response.
(13)
Safety Program Management.
(A)
The owner or operator of a stationary source subject to this chapter shall develop a management system to oversee the implementation of the safety program elements.
(B)
The owner or operator shall assign a qualified person or position that has the overall responsibility for the development, implementation, and integration of the safety program elements.
(C)
When responsibility for implementing individual requirements of this chapter is assigned to persons other than the person identified under subsection (a)(13)(B), the names or positions of these people shall be documented and the lines of authority defined through an organization chart or similar document.
(D)
Process Safety Performance Indicators.
(i)
No later than September 30, 2014, the department shall develop a list of stationary source activities and other events to be measured by each stationary source in order to evaluate the performance of process safety systems. This list is the "event list." Each stationary source shall measure these activities and other events and document the measurements. These documented measurements are "common process safety performance indicators." No later than June 30 of each year after 2014, each stationary source will report to the department the common process safety performance indicators recorded by the stationary source in the prior calendar year. The department will include these common process safety performance indicators in the annual performance review and evaluation report required by Section 450-8.030.
(ii)
The department shall review the event list at least once every three years to determine if it should be revised. If the department determines that a new activity or other event will be added to the event list, stationary sources shall report to the department the new common process safety performance indicator(s) by June 30 of the next year following the revision of the event list.
(iii)
No later than September 30, 2014, each stationary source shall develop a list of site-specific activities and other events that it will measure in order to evaluate the performance of its process safety systems. Each stationary source shall document these site-specific process safety performance indicators and make this documentation available to the department during an audit or inspection and upon request.
(b)
Human Factors Program.
(1)
Stationary sources shall develop a written human factors program that follows the human factors guidance document developed or adopted by the department. The program shall be developed within one-year following the issuance of the county guidance documents, the effective date of the ordinance codified in this section, or as otherwise allowed by this chapter, whichever is later. The human factors program shall address:
(A)
The inclusion of human factors in the process hazards analysis process;
(B)
The consideration of human systems as causal factors in the incident investigation process for major chemical accidents or releases or for an incident that could reasonably have resulted in a major chemical accident or release;
(C)
The training of employees in the human factors program;
(D)
Operating procedures;
(E)
Maintenance safe work practice procedures and maintenance procedures for specialized equipment, piping, and instruments, no later than June 30, 2011; and
(F)
The requirement to conduct a management of change prior to staffing changes for changes in permanent staffing levels/reorganization in operations, maintenance, health and safety, or emergency response. This requirement shall also apply to stationary sources using contractors in permanent positions in operations and maintenance. Prior to conducting the management of change, the stationary source shall ensure that the job function descriptions are current and accurate for the positions under consideration. Staffing changes that last longer than ninety days are considered permanent. Temporary changes associated with strike preparations shall also be subject to this requirement. Employees and their representatives shall be consulted in the management of change.
(2)
Employees and their representatives shall participate in the development of the written human factors program.
(3)
The program shall include, but not be limited to, issues such as staffing, shiftwork and overtime.
(4)
A description of the human factors program subsections (b)(1) through (b)(3) shall be included in the safety plan prepared by the stationary source.
(c)
Root Cause Analysis and Incident Investigation.
(1)
Stationary sources shall conduct a root cause analysis for each major chemical accident or release which occurs after the effective date of the ordinance codified in this chapter. Stationary sources shall periodically update the department on facts related to the release or incident, and the status of a root cause analysis conducted pursuant to this section, at meetings scheduled by the department in cooperation with the stationary source. To the maximum extent feasible, the department and the stationary source shall coordinate these meetings with other agencies with jurisdiction over the stationary source. Within thirty days of completing a root cause analysis performed pursuant to this section, the stationary source shall submit to the department a final report containing that analysis, including recommendations to be implemented to mitigate against the release or incident reoccurring, if any, and a schedule for completion of resulting recommendations. The stationary source shall also comply with subsection (i)(1)(E) if applicable. The department may require the stationary source to submit written, periodic update reports at a frequency not to exceed every thirty days until the final report is submitted. The methodology of the root cause analysis shall be one of the methodologies recognized by the Center for Chemical Process Safety or shall be reviewed by the department to determine substantial equivalency.
(2)
The department may elect to do its own independent root cause analysis or incident investigation for a major chemical accident or release. If the department elects to conduct a root cause analysis or incident investigation the stationary source shall cooperate with the department by providing the following access and information in a manner consistent with the safety of department and stationary source personnel and without placing undue burdens on the operation of the stationary source:
(i)
Allow the department to investigate the accident site and directly related facilities such as control rooms, physical evidence and where practicable the external and internal inspection of equipment;
(ii)
Provide the department with pertinent documentation; and
(iii)
Allow the department to conduct independent interviews of stationary source employees, subject to all rights of the stationary source and employees to be represented by legal counsel and/or management and union representatives during such interviews. If in the course of the department's root cause analysis or incident investigation access is required to areas of the stationary source which in the judgment of the stationary source requires personnel entering the area to use protective equipment and/or have specialized training the department shall provide its personnel with such equipment and training. To the maximum extent feasible, the department shall coordinate any root cause analysis or incident investigation it conducts with investigations conducted by other agencies with jurisdiction over the stationary source to minimize the adverse impacts on the stationary source and/or its employees.
(3)
No part of the conclusions, findings or recommendations of the root cause analysis conducted by the department or stationary source, or incident investigation conducted by the department, relating to any major chemical accident or release or the investigation thereof shall be admitted as evidence or used in any action or suit for damages arising out of any matter mentioned in such report.
(4)
If the department issues a root cause analysis report, the stationary source shall comply with subsection (i)(1)(E) if applicable.
(d)
Process Hazard Analysis/Action Items.
(1)
Process hazard analyses will be conducted for each of the covered processes according to one of the following methods: What-if, checklist, what-if/checklist, hazard and operability study (HAZOP), failure mode and effects analysis (FMEA), fault tree analysis or an appropriate equivalent methodology approved by the department prior to conducting the process hazard analysis. The PHA shall be appropriate to the complexity of the covered process and shall identify, evaluate, and control the hazards involved in the covered process. The PHA shall address: the hazards of the process; the identification of any previous incident which had a likely potential for catastrophic consequences; engineering and administrative control applicable to the hazards and their interrelationships such as appropriate application of detection methodologies to provide early warning of releases (acceptable detection methods might include process monitoring and control instrumentation with alarms, and detection hardware such as hydrocarbon sensors); consequences of failure of engineering and administrative controls; covered process and stationary source siting; human factors; and a qualitative evaluation of a range of the possible safety and health effects of failure of controls. Process hazard analyses should also include consideration of external events except for seismic analyses, which are only required when criteria listed in subsection (d)(2) are satisfied. All process hazard analyses shall be performed by a team with expertise in engineering and process operations, and the team shall include at least one employee who has experience and knowledge specific to the process being evaluated. Also, one member of the team must be knowledgeable in the specific PHA methodology being used.
(2)
The process hazard analyses shall be conducted within one-year of the effective date of the ordinance codified in this chapter and no later than the submittal date of the safety plan. Previously completed process hazard analyses that comply with the California Code of Regulations, Title 8, Section 5189, and/or the California Code of Regulations, Title 19, Section 2760.2 are acceptable for the purposes of this chapter. Process hazard analyses shall be updated and revalidated at least once every five years after completion of the initial process hazard analysis. Updated and revalidated process hazard analyses completed to comply with the California Code of Regulations, Title 8, Section 5189, and/or the California Code of Regulations, Title 19, Section 2760 are acceptable for meeting the update and revalidation requirement. Seismic events shall be considered for processes containing a substance defined in the California Code of Regulations, Title 19, Chapter 4.51, Section 2770.5, if the distance to the nearest public receptor for a worst case release scenario specified by the California Code of Regulations, Title 19, Chapter 4.5, Section 2750.3 is within the distance to a toxic or flammable endpoint as defined in California Code of Regulations, Title 19, Chapter 4.5, Section 2750.2(a).
(3)
For all covered processes, the stationary source shall document the decision made to implement or not implement all PHA recommended action items and the results of recommendations for additional study. The stationary source shall complete recommended actions from the initial PHA and from PHA revalidations, identified by the process hazard analysis and selected for implementation by the stationary source as follows: all actions not requiring a process shutdown shall be completed within one-year after the completion of the PHA; all actions requiring a process shutdown shall be completed during the first regularly scheduled turnaround of the applicable process subsequent to one-year after the completion of the PHA unless the stationary source demonstrates to the satisfaction of the department that such a schedule is infeasible. For recommended actions not selected for implementation, the stationary source shall include the justification for not implementing the recommended action. For all covered processes, the stationary source shall retain documentation of closure, and any associated justifications, of actions identified by the PHA. The stationary source shall communicate the actions to operating, maintenance, and other employees whose work assignments are in the process and who may be affected by the recommendations or actions.
(e)
Accident History.
(1)
The stationary source shall include an accident history in the safety plan of all major chemical accidents or releases from June 1, 1992, through the date of safety plan submittal to the department. For each major chemical accident or release the stationary source shall report the following information, to the extent known:
Date, time and approximate duration of the release;
Chemicals released;
Estimated quantity released in pounds;
Type of release event and its source;
Weather conditions at the time of the release;
On-site impacts;
Known off-site impacts;
Initiating event and contributing factors;
Root cause(s);
Whether off-site responders were notified; and
Operational or process changes that resulted from the investigation of the release.
(2)
The stationary source shall annually submit a report of the accident history to the department. The first report shall be due two years after the effective date of the ordinance codified in this chapter, and subsequent reports shall be due by June 30th of each year.
(f)
Certification. The owner or operator shall submit in the safety plan a single certification that, to the best of the signer's knowledge, information, and belief formed after reasonable inquiry, the information submitted is true, accurate, and complete.
(g)
Security and Vulnerability Assessment. Each stationary source shall perform and document a security and vulnerability assessment as defined in the Contra Costa County CalARP program guidance document, by June 30, 2007, and at least once every five years after the initial assessment, or as prescribed by federal regulation. The stationary source shall document its process for assuring that recommendations are addressed.
(h)
Safety Culture Assessment. The stationary source shall conduct a safety culture assessment. The assessment shall be based upon a method listed in the Contra Costa County CalARP program guidance document or shall be reviewed by the department to determine substantial equivalency. The initial assessment shall be performed by one-year following the revisions to the industrial safety ordinance guidance document that addresses the safety culture assessment, and at least once every five years thereafter. The safety culture assessment will be reviewed during the audit and inspection of the stationary source. The department may perform its own safety culture assessment after a major chemical accident or release or the occurrence of any incident that could reasonably have led to a major chemical accident or release, or based on department audit results of the stationary source.
(i)
Inherently Safer Systems Analysis.
(1)
A stationary source shall conduct an inherently safer systems analysis (ISSA) for each covered process as follows:
(A)
The stationary source shall conduct an ISSA on existing covered processes every five years.
(B)
The stationary source shall conduct an ISSA in the development and analysis of recommended action items identified in a PHA.
(C)
Effective September 30, 2014, whenever a major change is proposed at a facility that could reasonably result in a major chemical accident or release, the stationary source shall conduct an ISSA as part of a management of change review required by subsection (a)(6)(B).
(D)
If an incident occurs on or after September 30, 2014, an investigation of the incident is conducted pursuant to subsection (a)(9)(A) and the incident investigation report recommends a major change that could reasonably result in a major chemical accident or release, the stationary source shall commence and complete an ISSA of the recommended major change as soon as administratively practicable after completion of the incident investigation report.
(E)
If an incident occurs on or after September 30, 2014, a root cause analysis of the incident is conducted as required by subsections (c)(1) or (c)(2), and the root cause analysis report or an associated incident investigation report recommends a major change that could reasonably result in a major chemical accident or release, the stationary source shall commence and complete an ISSA of the recommended major change as soon as administratively practicable after completion of the root cause analysis report.
(F)
The stationary source shall conduct an ISSA during the design of new processes, process units and facilities. Immediately upon completion of the ISSA report referred to in subsection (i)(2), the stationary source shall advise the department of the availability of the ISSA report.
(2)
The stationary source shall prepare a written report documenting each ISSA within thirty days of completion of the ISSA and make the report available to the department during an audit or inspection and upon request. The ISSA report must contain, at a minimum, the following information:
(A)
Identification and a description of the inherently safer system(s) analyzed in the ISSA;
(B)
A description of the methodology used to analyze the inherently safer systems(s);
(C)
The conclusions of the analysis;
(D)
The rationale for the conclusions; and
(E)
An action plan, including a timeline to implement the inherently safer system(s) recommended in the ISSA.
(3)
The stationary source shall select and implement each inherently safer system identified in an ISSA report to the greatest extent feasible and as soon as administratively practicable. If a stationary source concludes that implementation of an inherently safer system is not feasible, the stationary source shall document the basis for this conclusion in meaningful detail. The documentation shall include sufficient evidence to demonstrate to the department's satisfaction that implementing the inherently safer system is not feasible and the reasons for this conclusion. A claim that implementation of an inherently safer system is not feasible shall not be based solely on evidence of reduced profits or increased costs.
(j)
Safeguard Protection Analysis.
(1)
Effective September 30, 2014, a stationary source shall conduct a Layer of Protection Analysis or an alternative type of analysis approved by the department that uses a quantitative, qualitative or equivalent semi-quantitative method to determine the effectiveness of existing safeguards and safeguards recommended in a PHA to reduce the probability and/or severity of a catastrophic release. The safeguard protection analysis may be a standalone analysis or incorporated within a PHA.
(2)
The stationary source shall complete the safeguard protection analysis no later than June 30, 2019. A safeguard protection analysis that was completed by a stationary source within five years prior to June 30, 2019, in accordance with the standards set forth in subsection (j)(1), will be deemed to comply with this requirement. The stationary source shall update and revalidate the safeguard protection analysis at least once every five years.
(3)
All safeguard protection analyses shall be performed by a team with expertise in engineering and process operations. The team shall include at least one employee who has experience and knowledge specific to the safeguards and one member who is knowledgeable about the specific safeguard protection analysis method used.
(4)
The stationary source shall prepare a written report that documents the safeguard protection analysis in accordance with the standard of practice applicable to the type of analysis conducted. The stationary source will complete the report within thirty days after the completion of the safeguard protection analysis and make the report available to the department during an audit or inspection and upon request.
(Ord. No. 2014-07, § V, 6-17-14; Ords. 2006-22 § 5, 2000-20 § 1, 98-48 § 2)