All construction (including, but not limited to, the initial construction of the cable
system and any major rebuild, expansion, replacement, repair or maintenance of the
cable system) shall be performed in compliance with this division and all other provisions
of this code. At least ninety days prior to initiating any major construction (other
than routine maintenance or repair, installation of subscriber drops or minor line
extensions), a cable operator shall submit a construction plan to the county. For
purposes of this section, "major construction" means a system upgrade, system rebuild,
or any work in the public rights-of-way that can be reasonably expected to affect
system plant served by one or more fiber optic nodes. The construction plan shall
include a description of the work, equipment specifications, existing and proposed
locations of all facilities, traffic control plans, resident and business notification
plans, steps to be taken to ensure compliance with local regulations, and a detailed
construction schedule. The county may approve, conditionally approve or deny the construction
plan. The county may require the posting of construction bonds. Additional construction
requirements may be specified in a franchise agreement.
(Ords. 2006-65 § 3, 93-55, 82-28).
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');