Contra Costa County |
Ordinance Code |
Title 7. BUILDING REGULATIONS |
Division 716. GRADING |
Chapter 716-4. PERMITS |
§ 716-4.608. Plans and specifications—Statements required.
Plans and specifications shall also contain:
(a)
A statement of the quantities of material to be excavated and/or filled and the amount of such material to the imported to, or exported from the site;
(b)
A statement of the estimated starting and completion dates for work covered by the permit;
(c)
A promise signed by the owner, or his authorized agent, that a civil engineer, soil engineer and/or engineering geologist will be employed to give technical supervision or make inspections of the work, whenever approval of the plans and issuance of the permit is to be based on the condition that such professional person be so employed;
(d)
Routes of travel to be used for trucks hauling material to and from the site;
(e)
Hours and days of work approved by the county building official, the zoning administrator, or the appropriate governing body.
(Ords. 99-46 § 6: 69-59 § 1, 1969).
Article 716-4.8. Reports