§ 816-6.1202. Tree protection.  


Latest version.
  • Except where otherwise provided by the involved development's conditions of approval or approved permit application, on all properties where trees are required to be saved during the course of development, the developer shall follow the following tree preservation standards:

    (1)

    Prior to the start of any clearing, stockpiling, trenching, grading, compaction, paving or change in ground elevation on a site with trees to be preserved, the applicant shall install fencing at the dripline or other area as determined by an arborist report of all trees adjacent to or in the area to be altered. Prior to grading or issuance of any permits, the fences may be inspected and the location thereof approved by appropriate county staff.

    (2)

    No grading, compaction, stockpiling, trenching, paving or change in ground elevation shall be permitted within the dripline unless indicated on the grading plans approved by the county and addressed in any required report prepared by an arborist. If grading or construction is approved within the dripline, an arborist may be required to be present during grading operations. The arborist shall have the authority to require protective measures to protect the roots. Upon completion of grading and construction, an involved arborist shall prepare a report outlining further methods required for tree protection if any are required. All arborist expense shall be borne by the developer and applicant unless otherwise provided by the development's conditions of approval.

    (3)

    No parking or storing vehicles, equipment, machinery or construction materials, construction trailers and no dumping of oils or chemicals shall be permitted within the dripline of any tree to be saved.

(Ords. 94-59, 94-22).