§ 82-28.1006. Standards for subdivisions.  


Latest version.
  • (1)

    All applications for tentative map approval are incomplete unless the tentative maps identify the flood hazard area and the elevation of the base flood. (See Section 82-28.806(2))

    (2)

    All final subdivision improvement plans shall provide the elevation of proposed structure(s), pads and streets. If the site is filled above the base flood, the final pad elevations shall be certified by a registered professional engineer or surveyor and provided to the floodplain administrator.

    (3)

    All subdivision proposals shall be consistent with the need to minimize flood damage.

    (4)

    All subdivision proposals shall have public utilities and facilities such as road, sewer, gas, electrical and water systems located and constructed to minimize flood damage.

    (5)

    All subdivisions shall provide adequate drainage to reduce exposure to flood hazards.

(Ords. 2000-33, 99-35, 96-11, 90-118, 88-50, 87-45).