§ 84-63.406. Change-in-risk project.  


Latest version.
  • A "change-in-risk project" means a new use of an existing building, structure, or facility, not involving construction other than minor alterations, which use will involve a hazardous material or hazardous waste in a higher hazard category and which use will result in a hazard score higher than the hazard score of the previous use.

(Ords. 98-48 § 5, 96-50, 96-20).