§ 88-3.804. Reclamation plan requirements.  


Latest version.
  • The reclamation plan shall identify the specific properties it applies to and shall indicate removal of all buildings, structures, WECS, and foundations to three feet below finish grade; road repair costs required by Section 88-3.414; and all regrading and revegetation necessary to return the subject property to the condition existing prior to establishment or expansion of the WECS. Reclamation shall reflect the site-specific character including topography, vegetation, drainage, and any unique environmental features. A materials and labor estimate shall be submitted for the total reclamation costs.

(Ord. 85-39 § 4).